National Repository of Grey Literature 45 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Construction technology study stage rough construction object Barrack Court in Hodonin
Lačňák, Slavomír ; Štěrba, Martin (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis focuse on the processing of selected parts of construction technological study for an object Kasárenský dvůr Hodonín. The bachelor contains the object engineering report, technological study of major technological stages of construction site, schedule and financial plan construction,the basic concept of the building operation, bills of quantities, technological report foundation construction and safety measures on the construction.
Mixed-use Building in Uherský Brod - Execution of Superstructure
Seménka, Petr ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The content of this bachelor's thesis is a building-technological project of the new building of a polyfunctional building in Uherský Brod. The work includes technical reports, solutions for transport routes, technological rules for making vertical constructions from Porotherm, MaxPlus and reinforced concrete. A control and test plan and design of the plant site including with technical report and a design of the machine assembly are also elaborated on the technological regulations. Furthermore, work safety and timetable and a budget for both variants are developed.
Residential complex Troubsko - construction technology plan
Jurák, Ondřej ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
Selected Parts of the Construction Technology Project for an Apartment Building in Kroměříž
Vyoralová, Tereza ; Hrdlička, Michal (referee) ; Mohapl, Martin (advisor)
In my master’s thesis, I deal with the preparation and implementation of selected parts of the construction technology project of an apartment building in Kroměříž. It is a non-basement building with 5 above-ground floors. The content of my master’s thesis is the preparation of a technical report for a construction and engineering project, a coordination situation with the solution of closer traffic relations, an assessment of the route of the tower crane, the object's time and financial plan, calculation according to THU, a study of the implementation of the main technological stages of the construction object, a construction site equipment project, which contains a technical report of the construction site equipment for rough construction and finishing works, as well as drawings for the given stages, a design of the main construction machines and mechanisms, a time schedule, an itemized budget for selected parts of SO 01.4, a technological regulation for the ETICS insulation system, a technological regulation for the installation of windows. Control and test plans were drawn up for both technological regulations. Furthermore, in my diploma thesis, there are catchment systems of flat roofs and the blow-door test.
Multifunctional building - Houbalova - construction technology project
Ševčík, Jan ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of building technology project poly-functional complex with a focus on execution of construction. Gross building is designed reinforced concrete skeleton combined with masonry. Technology will be developed Code for reinforced concrete monolithic frame and masonry. On the techno-logical stage it will be processed inspection and test plan and the balance of the major sources for the implementation of reinforced concrete structures 1.NP. The thesis is a proposal for construction site, which is complemented by a social facilities and offices. For an overall view of the construction of a multifunctional complex is processed time and financial plan, which will be further elaborated for building construction B. Availability of supply is verified by the design of routes. Like other task will be processed proposal formwork system for con-struction 1.NP Building B.
Technological phase of the upper structure of the polyfunctional building in Žilina
Papučík, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is the processing of the construction technological stage of the superstructure of the polyfunctional building in Žilina. The bachelor's thesis is a technical report of a building-technological project, a time schedule for the construction of a given technological stage, a situation of a construction site, a construction organization for a given technological phase, a solution of transport routes to a construction site, a gross building budget, a technical regulation for masonry and monolithic ceiling constructions, occupational safety and health, design of machine assembly, control test plan for masonry and prefabricated ceiling constructions, comparison of cranes.
Commercial building in Brno - the construction technological planning
Sedláček, Stanislav ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The aim of my thesis was to perform construction and technological preparation of the construction of commercial house in Brno in the street Křídlovická. The introduction contains the expected design and construction process of the proposed building as a whole. It is also prepared a preliminary draft of the financial cost of the entire project designed according THU and object schedule. Furthermore, the implementation of the project construction site for a major part of the commercial house. Gradually work focuses mainly on the implementation of the technological stage of construction site with detailed processing procedure for the implementation of monolithic concrete structures of the building.
Building "G" of the residential complex "U Dubu" in Jihlava - construction technology project
Svízela, Martin ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the elaboration of a construction technological project for an apartment house in the complex "U Dubu" in Jihlava. Specifically, we dealt with building G (designated as D1.06). This building is based on foundation strips and has one underground and five above-ground floors. The content of the work is a technical report on the construction technology project, elaboration of technological regulation for the given stage, construction site equipment project, evaluation of wider transport relations, time schedule for the given stage and item budget of rough construction. Furthermore, a control and test plan, design of machine sets, work safety solutions, construction calculation according to THU and comparison of masonry systems are also developed.
Technological phase of the upper structure of the apartment building in Otrokovice
Králíček, Jiří ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The bachelor thesis deals with the description of the technological process in the execution of the gross overhead construction of a multifunctional apartment building in Otrokovice. These are the brickwork of load bearing and non-load-bearing vertical structures, the execution of reinforced concrete translations, columns, translations and ceilings. The content of the thesis is a technical report focusing on the given technological phase, solution of the transport routes, technological regulation for the given stage, technical report of the construction site including the situation, design of the machine assembly, safety of the solved technological phase, control and test plan, report statement, budget, schedule a comparison of the hydraulic manipulator and self-construction crane.
Upper structure construction technology phase for lesure time building
Kočí, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is to solve selected parts of the building-technological study of the gross top-structure for the object of the Centre for leisure-time activities in Jihlava. The bachelor's thesis is a technical report of a solved object, a technological study of the implementation of the main technological stages for the given building, a timetable for the construction of the technological stages of the rough construction, the basic concept of the construction site, the situation of the building site equipment, the technical report of the building site, Dimensions of gross overhead construction, technological regulation after masonry and prefabricated ceiling construction, occupational safety and health protection, design of machine assemblies. A control test plan for masonry and prefabricated ceiling constructions.

National Repository of Grey Literature : 45 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.